PLN power connection and daya upgrades in Bali. Need more VA for AC, water heater or EV charging? We handle the process.
Adding air conditioning, a water heater, a pool pump or an EV charger to a Bali property very often reveals the same problem: the existing PLN connection simply is not big enough. We advise on the right daya (VA) for your real load, prepare the electrical work on your side so the changeover passes, and assist you through the PLN application process. Done in the right order, the upgrade is straightforward; done blindly, PLN can reject it or you end up paying for capacity you do not actually need.
If you are building on land with no existing meter, the process is a new PLN connection rather than an upgrade. This involves applying for a new sambungan baru, having PLN run the service and install a prepaid (token) or postpaid meter, and connecting it to your distribution board. We prepare the incoming side โ main MCB, earthing and meter board position โ so the connection is ready the day PLN attends, and we advise on the right daya from the start so you do not have to upgrade again six months later.
The official PLN upgrade fee runs roughly IDR 300,000โ1,500,000 depending on the increase. Our assistance and preparation work starts from IDR 500,000, and if your board cannot handle the new load a panel upgrade is IDR 1,500,000โ2,500,000. Everything is quoted upfront. See full pricing โ
Our preparation work is usually half a day. PLN's own changeover then takes anywhere from 3 days to 3 weeks after the application, depending on the area.
A daya upgrade frequently needs a matching MCB panel upgrade and may form part of a wider electrical installation. For background, read our full guide on how to upgrade your PLN power in Bali.
We cover Canggu, Seminyak, Ubud, Kuta, Legian, Denpasar, Sanur, Jimbaran, Nusa Dua and Uluwatu. No travel surcharge. Full service area โ
Tell us your area and the job. We reply within 30 minutes with availability and a price.
WhatsApp โ Get a Quote